Recommendations for major capital and maintenance expenditures should always be tempered by consideration of economics. APTECH staff has extensive experience in using economic forecasting and decision analysis tools to ensure that recommendations help maximize future profits. APTECH is also a world leader in detailed power plant cost un-bundling, so plant services such as load following, on-off cycling, minimum load operation, and AGC can be properly bid into competitive markets.

Services



APTECH consulting for power plant cycling costs, power plant cycling operations, power plant cost reduction, power plant reliability,

APTECH consulting for failure analysis, boiler tube failure analysis, boiler tube failure, metallurgical failure analysis, turbine

APTECH consulting for boiler inspection, boiler inspection service, piping inspection, boiler NDE, piping NDE, boiler tube evaluation, high

 

 

Value Assessment (AES154)


Due Diligence Review (AES089)

Risk-Based Inspection

Capital Cost Justification

System Dispatch

Energy Trading Support

Least Cost Coping Strategies

Cost of Cycling Estimation
    (AES044)

Cost of Ancillary Services

Variable O&M Cost Unbundling (AES076)

Generation Expansion Optimization

 

 

Products


COSTCOM (AES034)

More information on COSTCOM


 

APTECH consulting for power plant reliability, equipment reliability, reliability improvement, equipment life optimization, boiler tube

APTECH provides: Economic evaluation of power plant performance improvements, cost of power plant load cycling, probabilistic and deterministic failure forecasting, and component specific reliability and failure forecasting.

Did you know — APTECH provides engineering services for power plants including: Economic evaluation of power plant performance improvements, cost of power plant load cycling, probabilistic and deterministic failure forecasting, and component specific reliability and failure forecasting. services cont.

Cycling Advisor (AES127)

More information on Cycling Advisor


Life Optimization Database

Risk-based Inspection Timing Model

Generation Screening Curve Model


APTECH Power Quick Links

Aptech Power Bookmark

 
HOME
 APTECH Corp > APTECH PGG> Plant Service Areas: ECONOMIC OPTIMIZATION  

Aptech Engineering Services, Inc. 601 W. California Ave., Sunnyvale, California (408) 745-7000 © 2005, APTECH Engineering Services, Inc. All rights reserved. Reproduction in whole or in part in any form without the express written permission of an officer of the company is strictly prohibited.

Web & graphics design by xyberMEDiA.com. Report problems to support@xybermedia.com APGG-V3.0 R